DocumentCode
631391
Title
Selection of power from shore for an offshore Oil and Gas development
Author
Thibaut, E. ; Leforgeais, Bruno
Author_Institution
TOTAL SA, Paris, France
fYear
2013
fDate
28-30 May 2013
Firstpage
1
Lastpage
7
Abstract
With a step out distance of 161 km and a design power of 55MW, Martin Linge offshore gas field, will be the longest AC submarine cable power supplying an entire offshore Oil and Gas platform from the shore. This field development comprises a platform with a jack up rig and a Floating Storage Offloading unit.
Keywords
offshore installations; power transmission; submarine cables; AC submarine cable power; Martin Linge offshore gas field; distance 161 km; floating storage offloading unit; offshore gas development; offshore oil development; power 55 MW; power selection; Cable insulation; Power cables; Reactive power; Static VAr compensators; Turbines; Underwater cables; Voltage control; GIS; Power From Shore; SVC; Subsea Cable;
fLanguage
English
Publisher
ieee
Conference_Titel
PCIC Europe (PCIC EUROPE), 2013 Conference Record
Conference_Location
Istanbul
ISSN
2151-7665
Print_ISBN
978-1-4799-0097-8
Type
conf
Filename
6581590
Link To Document