Title :
Asset and risk management for a wind farm in a competitive electricity market
Author :
Izadpanah, H. ; Yousefi, G.R. ; Kaviri, S. Makhdoumi
Author_Institution :
Dept. of Electr. & Comput. Eng., Isfahan Univ. of Technol., Isfahan, Iran
Abstract :
In a competitive electricity market, a GENCO which has wind generation, is able to control and minimize its trading risks by participating in different markets such as spot market and bilateral contracts. Wind generation may have a high level of risk due to uncertainties in wind, energy price fluctuations and penalties due to energy unbalancing. In this paper, we have focused on optimum bidding of wind generation using utility theory, considering the risks which exist in wind generation. We proposed a new method to find the optimum bidding amount in different markets in such a way that maximum benefit and minimum risk could be achievable, simultaneously. We have used historical data of the Spain electricity market (which is available online) to show effectiveness of the proposed method.
Keywords :
asset management; power generation control; power generation economics; power markets; power system management; pricing; risk management; tendering; wind power plants; GENCO; Spain competitive electricity market; asset management; bilateral contract; energy price fluctuation; energy unbalancing; optimum bidding amount; power trading; risk management; spot market; utility theory; wind farm; wind generation; Contracts; Electricity supply industry; Generators; Lead; Portfolios; Resource management; Wind power generation; Asset management; bilateral contract; risk management; spot market; utility theory; wind generation;
Conference_Titel :
Electrical Engineering (ICEE), 2013 21st Iranian Conference on
Conference_Location :
Mashhad
DOI :
10.1109/IranianCEE.2013.6599765