    A proposal for the improvement of project´s cost predictability using EVM and historical data of cost

  • Author

    Diniz de Souza, Adler

  • Author_Institution
    COPPE, Univ. Fed. do Rio de Janeiro - UFRJ, Rio de Janeiro, Brazil
  • fYear
    2013
  • fDate
    18-26 May 2013
  • Firstpage
    1447
  • Lastpage
    1449
  • Abstract
    This paper proposes an extension of the Earned Value Management - EVM technique through the integration of historical cost performance data of processes under statistical control as a means to improve the predictability of the cost of projects. The proposed technique was evaluated through a case-study in industry, which evaluated the implementation of the proposed technique in 22 software development projects Hypotheses tests with 95% significance level were performed, and the proposed technique was more accurate and more precise than the traditional technique for calculating the Cost Performance Index - CPI and Estimates at Completion - EAC.
  • Keywords
    project management; software cost estimation; software development management; statistical analysis; CPI; EAC; EVM technique; cost historical data; cost performance index; earned value management; estimates at completion; historical cost performance data; hypothesis tests; project cost predictability; software development projects; statistical control; Accuracy; Equations; Mathematical model; Performance analysis; Software; Stability criteria; Cost Performance Index — CPI; Earned Value Management — EVM; High Maturity; Software Metrics;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Software Engineering (ICSE), 2013 35th International Conference on
  • Conference_Location
    San Francisco, CA
  • Print_ISBN
    978-1-4673-3073-2
  • Type

    conf

  • DOI
    10.1109/ICSE.2013.6606740
  • Filename
    6606740