DocumentCode
638592
Title
Integration: A case study
Author
Power, Alan J.
Author_Institution
Bechtel UK, London, UK
fYear
2013
fDate
3-6 June 2013
Firstpage
219
Lastpage
224
Abstract
Crossrail is a new £16bn railway being built in London. It runs from Maidenhead and Heathrow in the west to Shenfield and Abbey Wood in the east. There will be eight new underground stations all of which interface to a greater or lesser extent with pre-existing stations. The paper describes the unique challenges and issues involved with integrating Crossrail earthing, and other electrical systems, with existing railway infrastructures, notably Network Rail (Thameslink & SE Region) and London Underground, and the approaches taken to ensure safe and reliable railways are handed over after Crossrail is commissioned.
Keywords
earthing; railway electrification; London underground; Network Rail; crossrail earthing; electrical systems; railway infrastructures; underground stations; Bonding; Crossrail; Earthing; Integration; Systems;
fLanguage
English
Publisher
iet
Conference_Titel
Railway Electrification Infrastructure and Systems (REIS 2013), 6th IET Professional Development Course on
Conference_Location
London
Electronic_ISBN
978-1-84919-740-3
Type
conf
DOI
10.1049/ic.2013.0088
Filename
6617375
Link To Document