DocumentCode
644050
Title
Performance Improvement of Foundry through Lean Methodology: A Modelling & Simulation Approach
Author
Rodrigues, Lewlyn Lester Raj ; Shetty, Dasharathraj K. ; Hebbar, Santhoshs ; Hoskote, Rakshit N.
Author_Institution
Dept. of Humanities & Manage., Manipal Inst. of Technol., Manipal, India
fYear
2013
fDate
23-25 July 2013
Firstpage
193
Lastpage
198
Abstract
Lean manufacturing is a business model and it is oriented towards the collection of tactical methods that emphasize eliminating non-value added activities while delivering quality products on time at minimum cost with greater efficiency. The lean manufacturing paradigm has been used extensively in industrial sectors like automobile industry, where its assembly lines of components present better adaptability to the lean concepts. This paper starts with the proposition of applying lean manufacturing concepts in production processes, and contributes a lot to turn corporations more competitive. A System Dynamics (SD) based model has been developed for optimization of resources. The objective of this paper is to design the lean techniques for the foundry, to study the impact of lead time, shipment time, and correlation time on the throughput of the core shop and melt & mould shop, and also, on plant ready-for-dispatch (RFD) and dispatch section. The SD model developed through this research would serve the purpose of studying the influence of lead time, shipment time and correlation time to identifying the specific factors, which need to be controlled so as to enhance the plant efficiency.
Keywords
assembling; foundries; lean production; moulding; RFD; SD based model; assembly lines; automobile industry; business model; core shop; correlation time; dispatch section; foundry; industrial sectors; lead time; lean manufacturing paradigm; melt shop; modelling approach; mould shop; nonvalue added activities elimination; performance improvement; plant efficiency; plant ready-for-dispatch; production processes; quality product delivery; resource optimization; shipment time; simulation approach; system dynamics based model; tactical methods; Correlation; Delays; Electronic mail; Foundries; Manufacturing; foundry production process; lead time; lean methadology; performance improvement; system dynamics;
fLanguage
English
Publisher
ieee
Conference_Titel
Modelling Symposium (AMS), 2013 7th Asia
Conference_Location
Hong Kong
Type
conf
DOI
10.1109/AMS.2013.35
Filename
6664692
Link To Document