“Cost effective design of natural resource processing plants”
Author
Ostrzenski, Jack ; Symonds, Athol
Author_Institution
Fluor Canada Ltd., Calgary, AB, Canada
fYear
2013
fDate
6-11 Oct. 2013
Firstpage
1
Lastpage
13
Abstract
Building large natural resource processing plants in remote areas can be a challenge. In addition to the standard project issues, the Owner and Contractor have to address the unique challenges associated with the process technology selected, site conditions and the design approach. The paper describes in detail many of the challenges that the design and engineering team have to meet in order to address and solve the many "unconventional" issues involved. They can be grouped in the following order, according to priority: Approach to plant electrical design; Safety issues and concerns; Constructability and environmental issues. The application of very large (2 and 3 level) prefabricated Electrical Rooms (E-Rooms) on projects is a novel design approach used within the petrochemical and metallurgical industries. Similarly, the novel approach of bonding large process building steel structural members, which are epoxy coated at the steel fabricator, in order to achieve electrical continuity, has not yet been addressed in technical literature.
Keywords
costing; design for environment; facilities layout; industrial plants; mineral processing; safety; constructability; cost effective design; e-rooms; environmental issues; metallurgical industries; natural resource processing plants; petrochemical industries; prefabricated electrical rooms; safety issues; steel structural members; Production facilities; Resource management; Safety;
fLanguage
English
Publisher
ieee
Conference_Titel
Industry Applications Society Annual Meeting, 2013 IEEE
Conference_Location
Lake Buena Vista, FL
ISSN
0197-2618
Type
conf
DOI
10.1109/IAS.2013.6682575
Filename
6682575
Link To Document