• DocumentCode
    667743
  • Title

    Progress in the link calibration for UTC time transfer

  • Author

    Jiang, Z. ; Petit, G. ; Tisserand, L. ; Uhrich, P. ; Rovera, G.D. ; Lin, S.Y.

  • Author_Institution
    Time Dept., Bur. Int. des Poids et Mesures (BIPM), Sevres, France
  • fYear
    2013
  • fDate
    21-25 July 2013
  • Firstpage
    861
  • Lastpage
    864
  • Abstract
    The dominant part of the total uncertainty budget in the [UTC-UTC(k)] is from the type B uncertainty (uB) in time link calibration. In fact, 60% of the type A uncertainty (ua) in UTC time links are <; 1 ns while the 93% of uB ≥ 5ns. In 2011, the BIPM launched a pilot experiment to reduce the uB from 5 ns at present to ≤ 2 ns and has developed a standard calibration scheme, namely METODE, associated with an integrated portable GNSS calibrator together with the reference receivers stationary at BIPM. Similar setups are made in TL. Using these systems, we performed a series experiments at BIPM, OP and TL to study the attainable uncertainty of METODE. The results are compared to that of the traditional differential receiver calibrations.
  • Keywords
    calibration; radio receivers; satellite navigation; time measurement; METODE; UTC time transfer; integrated portable GNSS calibrator; link calibration; reference receivers; standard calibration scheme; total uncertainty budget; Calibration; Charge coupled devices; Clocks; Delays; Global Positioning System; Receivers; Uncertainty; Calibration; Time transfer; UTC;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    European Frequency and Time Forum & International Frequency Control Symposium (EFTF/IFC), 2013 Joint
  • Conference_Location
    Prague
  • Type

    conf

  • DOI
    10.1109/EFTF-IFC.2013.6702102
  • Filename
    6702102