DocumentCode
667743
Title
Progress in the link calibration for UTC time transfer
Author
Jiang, Z. ; Petit, G. ; Tisserand, L. ; Uhrich, P. ; Rovera, G.D. ; Lin, S.Y.
Author_Institution
Time Dept., Bur. Int. des Poids et Mesures (BIPM), Sevres, France
fYear
2013
fDate
21-25 July 2013
Firstpage
861
Lastpage
864
Abstract
The dominant part of the total uncertainty budget in the [UTC-UTC(k)] is from the type B uncertainty (uB) in time link calibration. In fact, 60% of the type A uncertainty (ua) in UTC time links are <; 1 ns while the 93% of uB ≥ 5ns. In 2011, the BIPM launched a pilot experiment to reduce the uB from 5 ns at present to ≤ 2 ns and has developed a standard calibration scheme, namely METODE, associated with an integrated portable GNSS calibrator together with the reference receivers stationary at BIPM. Similar setups are made in TL. Using these systems, we performed a series experiments at BIPM, OP and TL to study the attainable uncertainty of METODE. The results are compared to that of the traditional differential receiver calibrations.
Keywords
calibration; radio receivers; satellite navigation; time measurement; METODE; UTC time transfer; integrated portable GNSS calibrator; link calibration; reference receivers; standard calibration scheme; total uncertainty budget; Calibration; Charge coupled devices; Clocks; Delays; Global Positioning System; Receivers; Uncertainty; Calibration; Time transfer; UTC;
fLanguage
English
Publisher
ieee
Conference_Titel
European Frequency and Time Forum & International Frequency Control Symposium (EFTF/IFC), 2013 Joint
Conference_Location
Prague
Type
conf
DOI
10.1109/EFTF-IFC.2013.6702102
Filename
6702102
Link To Document