• DocumentCode
    668385
  • Title

    Research on port project management maturity model

  • Author

    Junmei Wang ; Peiwu Dong ; Guohua Qu ; XueZhou Zhang

  • Author_Institution
    Sch. of Manage. & Econ., Beijing Inst. of Technol., Beijing, China
  • Volume
    1
  • fYear
    2013
  • fDate
    23-24 Nov. 2013
  • Firstpage
    234
  • Lastpage
    238
  • Abstract
    The paper gives the port project management maturity model based on the ability of project construction preparation, schedule control, quality control, investment control, completion approval, comprehensive management process. The data is obtained through questionnaires. The evaluate index system and key practice in each level are described in this paper, and AHP decision analysis method is applied to determine the weight of each index factor in maturity. The practical application to enterprise shows that it could provide a valuable method for Chinese enterprises to implement project management.
  • Keywords
    analytic hierarchy process; investment; project management; quality control; scheduling; sea ports; AHP decision analysis; China; completion approval; comprehensive management process; evaluate index system; investment control; port project management maturity model; project construction preparation; project schedule control; quality control; Capability maturity model; Indexes; Investment; Optimization; Process control; Project management; Schedules; analytic hierarchy process (AHP); evaluation index; maturity level; project management maturity model (PM3);
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management, Innovation Management and Industrial Engineering (ICIII), 2013 6th International Conference on
  • Conference_Location
    Xi´an
  • Print_ISBN
    978-1-4799-3985-5
  • Type

    conf

  • DOI
    10.1109/ICIII.2013.6702917
  • Filename
    6702917