DocumentCode
668579
Title
Risk management methods of high-speed railway construction
Author
Tang Junhu ; Wang Yajie
Author_Institution
Coll. of Econ. & Manage., Hebei Univ. of Technol., Tianjin, China
Volume
2
fYear
2013
fDate
23-24 Nov. 2013
Firstpage
237
Lastpage
239
Abstract
In recent years, high-speed rail construction have gained tremendous progress in China. But the operation of high-speed railway construction and the risk management formed a huge contrast. Now the Ministry of Railway becomes the Railway Company. It appears trouble because of the accidents property compensation. The second trouble is how to ensure the source of funding high-speed rail. From the view of risk management, we can analysis and mathematical prediction, calculate the property damage, analysis of construction risks caused economic losses, casualties, direct economic losses, indirect economic losses quantified. The qualitative theoretical model can be transformed into a quantitative model, which provides a scientific basis to quantify the amount of insurance and insurance rates for the risk of loss. The writer proposed railway construction works insurance system operable, combining national laws and regulations.
Keywords
industrial accidents; insurance; mathematical analysis; occupational safety; railways; risk analysis; structural engineering; China; accidents; casualties; construction risk analysis; high-speed railway construction; indirect economic losses; insurance; mathematical prediction; national laws; national regulations; property damage; risk management methods; Accidents; Economics; Insurance; Organizations; Rail transportation; Risk management; Safety; construction; countermeasures; high-speed rail; risk management;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering (ICIII), 2013 6th International Conference on
Conference_Location
Xi´an
Print_ISBN
978-1-4799-3985-5
Type
conf
DOI
10.1109/ICIII.2013.6703128
Filename
6703128
Link To Document