Transmission swtiching to relieve voltage violations in low load period
Author :
Guo, W.M. ; Wei, Qingping ; Liu, G.J. ; Yang, May ; Zhang, X.K.
Author_Institution :
Henan Electr. Power Res. Inst., Zhengzhou, China
fYear :
2013
fDate :
22-25 Oct. 2013
Firstpage :
1
Lastpage :
4
Abstract :
With the development of modern power system, extra-high voltage (EHV) AC transmission lines are widely used. Because of large capacitive charging, long EHV AC lines may cause voltage violations in low load period. The leading-phase operation of synchronous generators and switching on shunt reactors are two common measures to relieve voltage violations in low load period. In this paper, we propose that opening some EHV lines in low load period, namely transmission switching is a more economic and efficient measure. The problem of finding an optimal topology to relieve voltage violations in low load period is formulated as a mixed integer non linear programming problem. After some simplifications, the model is converted to an easily solved mixed integer linear program. The modified IEEE 30-bus test system is used to evaluate the applicability and effectiveness of the proposed method.
Keywords :
integer programming; nonlinear programming; power transmission economics; EHV AC lines; IEEE 30-bus test system; extra-high voltage AC transmission lines; low load period; mixed integer nonlinear programming problem; transmission switching; voltage violations; Generators; Load modeling; Power system stability; Power transmission lines; Reactive power; Security; Switches; EHV power system; Transmission switching; voltage violations;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
TENCON 2013 - 2013 IEEE Region 10 Conference (31194)
Conference_Location :
Xi´an
ISSN :
2159-3442
Print_ISBN :
978-1-4799-2825-5
Type :
conf
DOI :
10.1109/TENCON.2013.6718480
Filename :
6718480
Link To Document :
بازگشت