DocumentCode :
677756
Title :
Practical assessment of a combined dispatching policy at a high-mix low-volume asic facility
Author :
Gissrau, Mike ; Rose, Oliver
Author_Institution :
X-FAB Dresden GmbH & Co. KG, Dresden, Germany
fYear :
2013
fDate :
8-11 Dec. 2013
Firstpage :
3745
Lastpage :
3755
Abstract :
The fabrication of semiconductor devices, even in the area of customer oriented business, is one of the most complex production tasks in the world. A typical wafer production process consists of several hundred steps with numerous resources including equipment and operating staff. A reasonable assignment of each resource at each time for a certain number of wafers is vital for an efficient production process. Several requirements defined by the customers and facility management must be taken into consideration with the objective to find the best trade-off between the different needs. In this paper we describe the practical assessment of a combined dispatching policy presented in Gissrau and Rose (2012). Besides the facility performance influence, also the human factor is taken into consideration. This includes dispatch compliance parameter and staff surveys.
Keywords :
application specific integrated circuits; customer services; dispatching; facilities management; human factors; semiconductor devices; combined dispatching policy; complex production; customer oriented business; customers; dispatch compliance parameter; facility management; high-mix ASIC facility; human factor; low-volume ASIC facility; production process; semiconductor devices; staff surveys; wafer production; Application specific integrated circuits; Business; Data models; Dispatching; Production facilities; Real-time systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference (WSC), 2013 Winter
Conference_Location :
Washington, DC
Print_ISBN :
978-1-4799-2077-8
Type :
conf
DOI :
10.1109/WSC.2013.6721734
Filename :
6721734
Link To Document :
بازگشت