DocumentCode :
684919
Title :
Re-entrant flow control in Q-time constraints processes for actual applications
Author :
Kobayashi, Akihiro ; Kuno, Takahiro ; Arima, Sumika
Author_Institution :
Univ. of Tsukuba, Tsukuba, Japan
fYear :
2013
fDate :
6-6 Sept. 2013
Firstpage :
1
Lastpage :
4
Abstract :
This paper presented solutions respond to three issues of scheduling of semiconductor manufacturing. As the First, we introduced how to apply SCKB-REFS rule, which is the optimal re-entrant flow dispatching for maximizing throughput of quality product in Q-time constraints processes, to the case of more than two different re-entrant flows. The performance of SCKB-REFS rule is evaluated by comparing with typical rules, FCFS-CT and LPFS-CT, in case that three different flows (i.e. specifications) share the same production tools. SCKB-REFS rule achieved the best performance in terms of mean cycle time and the throughput ratio in every traffic intensity as the result.
Keywords :
product quality; scheduling; semiconductor industry; FCFS-CT; LPFS-CT; Q-time constraints processes; SCKB-REFS rule; optimal re-entrant flow dispatching; production tools; quality product; re-entrant flow control; semiconductor manufacturing scheduling; traffic intensity; Buildings; Joints; Layout; product-mix loading; scheduling; setup; tool maintenance;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
e-Manufacturing & Design Collaboration Symposium (eMDC), 2013
Conference_Location :
Hsinchu
Type :
conf
DOI :
10.1109/eMDC.2013.6756052
Filename :
6756052
Link To Document :
بازگشت