DocumentCode :
685356
Title :
Micro-turbine installation feasibility in bulk water reticulation pipelines
Author :
Hakimi-Khiabani, Clifford ; Omar, I.
Author_Institution :
Cape Peninsula Univ. of Technol., Bellville, South Africa
fYear :
2013
fDate :
20-21 Aug. 2013
Firstpage :
1
Lastpage :
4
Abstract :
This paper presents an economic and theoretical feasibility study of the application of Micro Hydro Turbines at a case study Pressure Regulating Valve (PRV) site in a South African municipality´s bulk water supply system. By examining data collected from the case study site it is possible to determine the flow rate available and pressure of the supply water flowing through the PRV system. Using this data it is possible to determine the theoretical power production capabilities of this case study site. The overall results of the study show a promising theoretical production capacity of about 39000 kWh per annum from the installation of Micro Hydro Turbines at the case study PRV site, equating to a electricity cost saving of around R48 000.
Keywords :
hydraulic turbines; pipelines; power generation economics; valves; water supply; PRV site; PRV system; South African municipality bulk water supply system; bulk water reticulation pipelines; economic feasibility study; electricity cost saving; flow rate; microhydroturbines; microturbine installation feasibility; pressure regulating valve; supply water pressure; theoretical feasibility study; theoretical power production capability; theoretical production capacity; Cities and towns; Communities; Educational institutions; Hydraulic turbines; Libraries; Production;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial and Commercial Use of Energy Conference (ICUE), 2013 Proceedings of the 10th
Conference_Location :
Cape Town
ISSN :
2166-0581
Print_ISBN :
978-0-9922041-3-6
Type :
conf
Filename :
6761676
Link To Document :
بازگشت