DocumentCode :
685607
Title :
Protective relaying challenges faced during the “control cubicle replacement” project
Author :
Anderson, C. ; Gray, S.
Author_Institution :
CenterPoint Energy, Houston, TX, USA
fYear :
2013
fDate :
8-11 April 2013
Firstpage :
394
Lastpage :
407
Abstract :
This paper describes some of the challenges faced from a transmission system protective relaying standpoint in executing this project from conceptual design in January 2010 to completed installation in December 2011. Some topics that are addressed include automatic reclosing schemes, breaker failure schemes, autotransformer protection schemes as well as different protection schemes for the transmission lines. In addition, the challenges of transferring the protection schemes from the existing control cubicle to the new control cubicle while maintaining a substantial portion of the substation inservice are discussed.
Keywords :
autotransformers; circuit breakers; failure analysis; power transmission protection; relay protection; substation protection; transformer protection; automatic reclosing schemes; autotransformer protection schemes; breaker failure schemes; conceptual design; control cubicle replacement project; substation; transmission system protective relaying; Circuit breakers; Hurricanes; Relays; Storms; Substations; Surge protection; Surges;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Protective Relay Engineers, 2013 66th Annual Conference for
Conference_Location :
College Station, TX
Print_ISBN :
978-1-4799-5758-3
Type :
conf
DOI :
10.1109/CPRE.2013.6822054
Filename :
6822054
Link To Document :
بازگشت