DocumentCode :
690897
Title :
Property of worker allocation optimization with two professional workers in limited-cycle multiple periods
Author :
Xianda Kong ; Jing Sun ; Yamamoto, Hiroshi ; Matsui, Masaki
Author_Institution :
Dept. of Manage. Syst. Eng., Tokyo Metropolitan Univ., Tokyo, Japan
fYear :
2012
fDate :
10-13 Dec. 2012
Firstpage :
1267
Lastpage :
1271
Abstract :
In this paper, we deal with an assembly line with limited-cycle multiple periods with two kinds of workers. Skills of workers are assumed to be different. We consider an optimization problem for finding an allocation of workers to the line that minimizes total expected cost satisfying the demand. Then we propose a theorem of the property of the optimal worker allocation and discuss the other properties in conditions.
Keywords :
assembling; optimisation; personnel; assembly line; limited-cycle multiple periods; optimal worker allocation; optimization problem; professional worker allocation optimization property; total expected cost minimization; worker skills; Delays; Industrial engineering; Job shop scheduling; Market research; Numerical models; Resource management; Worker allocation optimization; limited-cycle problem with multiple periods; processing efficiency;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2012 IEEE International Conference on
Conference_Location :
Hong Kong
Type :
conf
DOI :
10.1109/IEEM.2012.6837947
Filename :
6837947
Link To Document :
بازگشت