DocumentCode :
694125
Title :
Batching and sequencing of incompatible job families for a single machine problem
Author :
Omar, Mohamed K. ; Suppiah, Yasothei
Author_Institution :
Bus. Sch. Malaysia, Nottingham Univ., Semenyih, Malaysia
fYear :
2013
fDate :
10-13 Dec. 2013
Firstpage :
733
Lastpage :
737
Abstract :
This paper extends the work of Omar and Suppiah [1] and proposes three combinations of heuristics that aim to minimize the total weighted tardiness for batching and sequencing of jobs originated from incompatible families with sequence dependent family setup time to be processed on a single machine. The developed three-combination include EDD-EDD, EDD-BATCS and ATC-BATCS. Computational performance experiments of EDD-EDD, EDD-BATCS and ATC-BATCS using 640 randomly generated instances was studied. The results indicate that the ATC-BATCS has outperformed the other two heuristics in terms of quality of the solution (minimizing total weighted tardiness).
Keywords :
batch processing (industrial); job production systems; ATC-BATCS; EDD-BATCS; EDD-EDD; incompatible job families; job batching; job sequencing; sequence dependent family setup; single machine problem; total weighted tardiness; Batch production systems; Indexes; Job shop scheduling; Processor scheduling; Sequential analysis; Single machine scheduling; Incompatible families; heuristics; sequence dependent setup times;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2013 IEEE International Conference on
Conference_Location :
Bangkok
Type :
conf
DOI :
10.1109/IEEM.2013.6962508
Filename :
6962508
Link To Document :
بازگشت