DocumentCode
694215
Title
An integrated production planning and order acceptance model with flexible due dates
Author
Aouam, T. ; Brahimi, N.
Author_Institution
Dept. of Ind. Eng., American Univ. of Sharjah, Sharjah, United Arab Emirates
fYear
2013
fDate
10-13 Dec. 2013
Firstpage
1214
Lastpage
1218
Abstract
A particular single stage production planning problem is considered in this paper. The problem consists of integrating sales with production planning decisions by allowing the production planner to choose the best orders to accept based on their profit and the available capacity. The resource capacity is considered in a more realistic way compared to classical models. Based on this, three models are suggested: a production planning problem with backordering which does not consider integration of decisions, an integrated model that allows order acceptance decisions, and finally an order acceptance model with flexible due dates on customer orders. Initially, the models are solved using a commercial solver in order to show the effectiveness of choosing integration of decisions and order due date flexibility. We show in the results how important is the latter model and we propose a heuristic to solve it. The results show that the heuristic is very promising.
Keywords
order processing; production planning; profitability; acceptance decisions; backordering; customer orders; date flexibility; flexible due dates; integrated production planning; order acceptance model; production planning decisions; production planning problem; single stage production planning problem; Capacity planning; Lead; Load modeling; Mathematical model; Planning; Clearing Functions; Flexible Lead Times; Load-Dependent Lead Times; Order Acceptance; Production Planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2013 IEEE International Conference on
Conference_Location
Bangkok
Type
conf
DOI
10.1109/IEEM.2013.6962604
Filename
6962604
Link To Document