Modelling of Uncertainty on Late Delivery for Construction Industry in Environmental Issues: A Preliminary Review
Author
Baharum, Zirawani ; Ngadiman, Salinin ; Mustaffa, Noorfa
Author_Institution
Malaysian Inst. of Technol., Univ. Kuala Lumpur, Skudai, Malaysia
fYear
2013
fDate
10-13 Sept. 2013
Firstpage
238
Lastpage
243
Abstract
The construction industry has many underlying causes and factors of uncertainty that impact on project completion schedule and time management. Uncertainties in design, procurement, operation and environmental issues are the major sources in construction project that should be managed. Most of researchers proposed a modelling and simulation techniques to solve these uncertainties problem nevertheless not for environmental issues. However, the environmental issues were also leading in significant deviations for project schedule as well in time management. The aims of this paper is to develop an initial model of uncertainty modelling to manage the underlying causes and factors that impact in environmental issue (EI) for construction industry (CI). The uncertainty structure is also presented to show the flows of uncertainty process which will be implemented in this case study as well. The simulation modelling and experimental study will base on a real case study and will verify and validate this suggestion. The validated model might be used as guidance to construction planners and managers to plan their project schedule. Further, the decision support system model-based will be developed for enhancement to integrate all uncertainty´s sources to become as a powerful system in the direction of managing the uncertainty.
Keywords
construction industry; decision support systems; design engineering; environmental factors; procurement; project management; scheduling; time management; construction industry; construction manager; construction planner; construction project; decision support system model; design issues; environmental issues; late delivery; operation issues; procurement issues; project completion schedule; project schedule; simulation modelling; simulation technique; time management; uncertainty modelling; uncertainty process; Accidents; Companies; Construction industry; Meteorology; Soil; Uncertainty; Modelling; Uncertainty; Environment Issues; Construction Industry; Southern-East Asia Region;
fLanguage
English
Publisher
ieee
Conference_Titel
Modelling and Simulation (EUROSIM), 2013 8th EUROSIM Congress on
Conference_Location
Cardiff
Type
conf
DOI
10.1109/EUROSIM.2013.115
Filename
7004950
Link To Document