DocumentCode :
697174
Title :
A solution of the job shop scheduling problem by decomposition method
Author :
Ferreira Ribeiro, Jose Francisco
Author_Institution :
USP / ICMC / SCE - DHP Lab., Univ. of Sao Paulo, São Carlos, Brazil
fYear :
2001
fDate :
4-7 Sept. 2001
Firstpage :
1025
Lastpage :
1028
Abstract :
A two-phase methodology for scheduling workshop jobs based on decomposition is presented in this article. The methodology uses a partition of the workshop in manufacturing cells for solving the global problem in a decomposed way. The scheduling is obtained by an approximate procedure that solves the job shop disjunction while taking into account the release and due dates. The proposed methodology allows us to efficiently solve some large size examples and works in real time, despite the non-polynomial nature of the problems studied. The corresponding program is written in C++ and runs on a microcomputer.
Keywords :
cellular manufacturing; decomposition; job shop scheduling; C++; approximate procedure; decomposition method; job shop disjunction; job shop scheduling problem; manufacturing cells; microcomputer; two-phase methodology; workshop job scheduling; Conferences; Europe; Job shop scheduling; Manufacturing; Production systems; Schedules; Control and Optimisation; Factory Modelling and Simulation; Large Scale Systems; Manufacturing Systems; Scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control Conference (ECC), 2001 European
Conference_Location :
Porto
Print_ISBN :
978-3-9524173-6-2
Type :
conf
Filename :
7076048
Link To Document :
بازگشت