DocumentCode :
704401
Title :
Factor affecting construction labor productivity in Thailand
Author :
Porntepkasemsant, Patraporn ; Charoenpornpattana, Santi
Author_Institution :
Constr. Eng. & Manage. Program, Dept. of Civil Eng., King Mongkut´s Univ. of Technol. Thonburi, Bangkok, Thailand
fYear :
2015
fDate :
3-5 March 2015
Firstpage :
1
Lastpage :
6
Abstract :
The construction industry is one of the most significant economics drivers of a country. However, there are many construction projects have a low labor productivity problem which leads project delaying and cost of the project overrunning. The objective of this study is to determine the factors effecting construction productivity in construction project in Thailand. A structured questionnaire survey was conducted and completed by 55 Thai construction contractors who involve in construction project in Thailand. The five highest ranking factors effecting labor productivity were absenteeism of worker; labor skill and experience; financial shortage; inspection and instruction delay; incomplete drawings. This study finding can be applied for labor productivity improvement in construction project. The project manager should focus on these factors at the early stage of construction project to gain effective results in productivity.
Keywords :
construction industry; labour resources; productivity; project management; Thailand; construction industry; construction labor productivity; financial shortage; incomplete drawings; inspection; instruction delay; labor skill; project management; worker absenteeism; worker experience; Delays; Economics; Indexes; Inspection; Planning; Productivity; Project management; Construction; Factor; Labor productivity; Thailand;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Operations Management (IEOM), 2015 International Conference on
Conference_Location :
Dubai
Print_ISBN :
978-1-4799-6064-4
Type :
conf
DOI :
10.1109/IEOM.2015.7093749
Filename :
7093749
Link To Document :
بازگشت