DocumentCode :
704470
Title :
Intelligent water drops algorithm on parallel machines scheduling
Author :
Kayvanfar, Vahid ; Alizadeh, Koorosh Mashhadi ; Teymourian, Ehsan
Author_Institution :
Dept. of Ind. Eng., Amirkabir Univ. of Technol., Tehran, Iran
fYear :
2015
fDate :
3-5 March 2015
Firstpage :
1
Lastpage :
5
Abstract :
Maximum completion time so called makespan as well as earliness and tardiness penalties are simultaneously minimized on parallel machines in this paper. An intelligent water drops (IWD) algorithm as a new swarm-based nature inspired optimization one is presented and applied to solve this problem. Experimental results show the superiority of the employed IWD method.
Keywords :
optimisation; scheduling; earliness penalties; intelligent water drops algorithm; parallel machines scheduling; swarm-based nature inspired optimization; tardiness penalties; Heuristic algorithms; Job shop scheduling; Optimization; Parallel machines; Processor scheduling; Rivers; Soil; Earliness and tardiness; Intelligent water drops (IWD); Makespan; Parallel machines;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Operations Management (IEOM), 2015 International Conference on
Conference_Location :
Dubai
Print_ISBN :
978-1-4799-6064-4
Type :
conf
DOI :
10.1109/IEOM.2015.7093842
Filename :
7093842
Link To Document :
بازگشت