DocumentCode :
704515
Title :
Achieving competitiveness through setup time reduction
Author :
Orta-Lozano, Minerva Mayela ; Villarreal, Bernardo
Author_Institution :
Universidad de Monterrey, Departamento de Ingeniería, San Pedro Garza Garcia, N.L. México
fYear :
2015
fDate :
3-5 March 2015
Firstpage :
1
Lastpage :
7
Abstract :
This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm´s operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market´s orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.
Keywords :
Cities and towns; Companies; Containers; Load modeling; Marine vehicles; Ports (Computers); Transportation; Color setup; SMED; Setup time reduction; production sequencing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Operations Management (IEOM), 2015 International Conference on
Conference_Location :
Dubai
Print_ISBN :
978-1-4799-6064-4
Type :
conf
DOI :
10.1109/IEOM.2015.7093897
Filename :
7093897
Link To Document :
بازگشت