DocumentCode
706477
Title
Controlled parameters in suboptimal solution
Author
Shin-Yeu Lin ; Jung-Shou Huang ; Shao-Kung Chang ; Chao-Fan Chang
Author_Institution
Dept. of Electr. & Control Eng., Nat. Chiao Tung Univ., Hsinchu, Taiwan
fYear
1999
fDate
Aug. 31 1999-Sept. 3 1999
Firstpage
901
Lastpage
905
Abstract
In this paper, two results are presented. Firstly, we discuss the role of a controlled parameter in the solution process of using heuristic methods to obtain a suboptimal solution for an optimization problem. We find that using qualitative analysis associated with simulations can estimate the increase or decrease of the objective value with respect to the variation of the parameter and provide an information whether to vary the parameter to achieve a better suboptimal solution. Secondly, to overcome computational complexity, we derive a sectional processing algorithm for long-horizon job-shop-flow scheduling problem. We found that the objective value is improved after we decomposed the long-horizon into consecutive short horizons. This fact reflects the first result. We have simulated the proposed sectional processing algorithm on quite a few examplses and obtain very good results in the aspects of CPU times and objective values.
Keywords
computational complexity; job shop scheduling; optimisation; CPU times; computational complexity; controlled parameter; heuristic method; long-horizon job-shop-flow scheduling problem; optimization; qualitative analysis; sectional processing algorithm; suboptimal solution; Optimization; heuristic algorithm; parameter; scheduling; suboptimal solution;
fLanguage
English
Publisher
ieee
Conference_Titel
Control Conference (ECC), 1999 European
Conference_Location
Karlsruhe
Print_ISBN
978-3-9524173-5-5
Type
conf
Filename
7099421
Link To Document