Title :
Production control in semiconductor manufacturing with time constraints
Author :
Sadeghi, Rezvan ; Dauzere-Peres, Stephane ; Yugma, Claude ; Lepelletier, Guillaume
Author_Institution :
Dept. of Manuf. Sci. & Logistics, EMSE-CMP, Gardanne, France
Abstract :
In this paper, production of lots under time constraints in a semiconductor wafer fabrication is investigated. A time constraint covers a sequence of process steps and has a maximum time that lots must spend in these steps. Lots which violate a recommended time constraint have to be scrapped or reprocessed. Accordingly, controlling the entrance of lots in a time constraint is critical in semiconductor fabrication. An approach is developed to estimate whether a given lot may satisfy time constraints or not. Some numerical experiments are presented with industrial data.
Keywords :
production control; semiconductor device manufacture; semiconductor technology; production control; semiconductor manufacturing; semiconductor wafer fabrication; time constraints; Job shop scheduling; Manufacturing; Probabilistic logic; Scheduling algorithms; Time factors;
Conference_Titel :
Advanced Semiconductor Manufacturing Conference (ASMC), 2015 26th Annual SEMI
Conference_Location :
Saratoga Springs, NY
DOI :
10.1109/ASMC.2015.7164446