Title :
Commissioning and testing of the first Lithium-Titanate BESS for the Italian transmission grid
Author :
Palone, F. ; Gemelli, G. ; Rebolini, M. ; Mocci, E. ; Necci, A. ; Pietrucci, M. ; Tortora, A.C.
Author_Institution :
Eng. Dept., Terna rete Italia S.p.A., Rome, Italy
Abstract :
Battery Energy Storage Systems (BESSs) represent an useful tool for grid support and integration of renewable energy sources. Amongst the different technologies, Lithium-Titanate batteries represent one of the most promising solutions, due to their very long expected lifetime. The paper deals with the commissioning and testing of Terna´s Lithium-Titanate, 1MWh, BESS in Codrongianos substation, both in grid-connected and islanded operation. Test results show that round trip efficiency and power accuracy target values are met and that the BESS can effectively be used for black-starting a MV grid.
Keywords :
commissioning; power grids; renewable energy sources; secondary cells; transmission networks; Codrongianos substation; Italian transmission grid; Li4Ti5O12; MV grid; Terna; battery energy storage systems; grid-connected operation; islanded operation; lithium-titanate BESS; lithium-titanate batteries; renewable energy sources; round trip efficiency; Batteries; Current measurement; Insulation; Power transformer insulation; Voltage measurement; BESS; Lithium Titanate; energy storage testing;
Conference_Titel :
Environment and Electrical Engineering (EEEIC), 2015 IEEE 15th International Conference on
Conference_Location :
Rome
Print_ISBN :
978-1-4799-7992-9
DOI :
10.1109/EEEIC.2015.7165305