Title :
A two-machine flowshop with unavailability interval on the second machine
Author :
Chen Ke-jia ; Jin Lian ; Wang Xiao
Author_Institution :
Sch. of Econ. & Manage., Fuzhou Univ., Fuzhou, China
Abstract :
The paper studies a two-machine flowshop with unavailability interval on the second machine. Contrary to most literature where machines are available at all times, this means that the machine may not always be available during the scheduling period, it needs a constant time to maintain the machine after completing a fixed number of jobs at most. The objective is to find the optimal job schedule such that the makespan is minimized. We focus on the relationship between the solution and the Johnson rule, and the performance of the Johnson rule as a heuristic when the job is resumable, analysis the worse-case performance ratio of the Johnson rule as a heuristic. Demonstrate the complexity of the problem when the job is nonresumable.
Keywords :
flow shop scheduling; minimisation; Johnson rule; makespan minimization; optimal job scheduling; second machine unavailability interval; two-machine flowshop scheduling; worst-case performance ratio; Approximation methods; Heuristic algorithms; Job shop scheduling; Operations research; Processor scheduling; Schedules; flowshop scheduling; heuristic algorithm; two-machine; unavailability interval; worst-case performance ratio;
Conference_Titel :
Service Systems and Service Management (ICSSSM), 2015 12th International Conference on
Conference_Location :
Guangzhou
Print_ISBN :
978-1-4799-8327-8
DOI :
10.1109/ICSSSM.2015.7170269