    Analysis of the maximum available time to switch the operation control mode of a distributed generation during an islanding occurrence

  • Author

    Neves, Rodolpho V.A. ; Agnoletto, Elian.J. ; Reis, Giann B. ; Machado, Ricardo Q. ; Oliveira, Vilma A.

  • Author_Institution
    Laboratory of Control Systems, Universidade São Paulo, São Carlos, Brazil
  • fYear
    2015
  • fDate
    June 29 2015-July 2 2015
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    The operation of distributed generation systems (DG) is subjected to events such as unintentional islanding occurrences. To prevent the activation of the DG´s protections and power supply interruption, when an islanding occurs, the DG must change from grid-connected operation mode to isolated operation mode and keep the voltage and the frequency within acceptable operational levels. The available time to switch the operation control mode should be investigated to avoid false islanding detections and to minimize the negative impact on the quality of the generated energy. This paper analyzes the maximum time for switching the operation control mode of the DG, after an unintentional islanding occurrence. Simulations were carried out on the PSCAD/EMTDC. The simulated DG system is based on a diesel generator and distinct loads. Using a classical control strategy (CCS) and a fuzzy control strategy (FCS) for voltage, frequency, active and reactive powers, the maximum available switching time is analyzed. The FCS provided longer available times than a strategy using classical controllers.
  • Keywords
    Fuzzy control; Islanding; PSCAD; Reactive power; Switches; Voltage control; Distributed generation; Fuzzy control; Islanded mode operation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    PowerTech, 2015 IEEE Eindhoven
  • Conference_Location
    Eindhoven, Netherlands
  • Type

    conf

  • DOI
    10.1109/PTC.2015.7232603
  • Filename
    7232603