DocumentCode :
735706
Title :
Analysis of the maximum available time to switch the operation control mode of a distributed generation during an islanding occurrence
Author :
Neves, Rodolpho V.A. ; Agnoletto, Elian.J. ; Reis, Giann B. ; Machado, Ricardo Q. ; Oliveira, Vilma A.
Author_Institution :
Laboratory of Control Systems, Universidade São Paulo, São Carlos, Brazil
fYear :
2015
fDate :
June 29 2015-July 2 2015
Firstpage :
1
Lastpage :
5
Abstract :
The operation of distributed generation systems (DG) is subjected to events such as unintentional islanding occurrences. To prevent the activation of the DG´s protections and power supply interruption, when an islanding occurs, the DG must change from grid-connected operation mode to isolated operation mode and keep the voltage and the frequency within acceptable operational levels. The available time to switch the operation control mode should be investigated to avoid false islanding detections and to minimize the negative impact on the quality of the generated energy. This paper analyzes the maximum time for switching the operation control mode of the DG, after an unintentional islanding occurrence. Simulations were carried out on the PSCAD/EMTDC. The simulated DG system is based on a diesel generator and distinct loads. Using a classical control strategy (CCS) and a fuzzy control strategy (FCS) for voltage, frequency, active and reactive powers, the maximum available switching time is analyzed. The FCS provided longer available times than a strategy using classical controllers.
Keywords :
Fuzzy control; Islanding; PSCAD; Reactive power; Switches; Voltage control; Distributed generation; Fuzzy control; Islanded mode operation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
PowerTech, 2015 IEEE Eindhoven
Conference_Location :
Eindhoven, Netherlands
Type :
conf
DOI :
10.1109/PTC.2015.7232603
Filename :
7232603
Link To Document :
بازگشت