Title :
Modified block replacement with used items at scheduled periods and at failures
Author :
Rebaiaia, Mohamed-Larbi ; Ait-kadi, Daoud ; Rahimi, Samira Abbasgholizadeh ; Jamshidi, Afshin
Author_Institution :
Interuniv. Res. Center on Enterprise Networks, Logistics & Transp., Laval Univ., Quebec City, QC, Canada
Abstract :
In maintenance engineering, it is intended that in a Block Replacement Policy (BRP) model, items are removed and replaced by new ones at failure and at the beginning of each scheduled time kT (fe = 1, 2, ...). It was proved that this kind of strategies has its limits and didn´t cover others particular situations. This paper addresses a modified BRP model, that in the same conditions, instead of using new items, used items are provided. The idea behind this model is to minimize the expected total cost while to reduce the impact of the removed items on the environment.
Keywords :
failure analysis; maintenance engineering; optimisation; reliability theory; scheduling; BRP model; block replacement policy; failure analysis; maintenance engineering; optimization; period scheduling; used item; Approximation methods; Density functional theory; Graphics; Maintenance engineering; Mathematical model; Reliability; Weibull distribution; Block replacement policy; Maintenance; Optimization; Sustainability;
Conference_Titel :
Control, Engineering & Information Technology (CEIT), 2015 3rd International Conference on
Conference_Location :
Tlemcen
DOI :
10.1109/CEIT.2015.7233173