Optimization of Project Duration Based on Network Planning Technique
Author
Guo, Zhen-Ning
fYear
2015
fDate
13-14 June 2015
Firstpage
753
Lastpage
756
Abstract
This article illustrates the optimization of project duration by network planning technology in the progress of project management process when the calculated duration cannot meet the target schedule requirements. It proposed an innovative method which can reduce the project time with minimum direct cost increment. Different optimization ways have been studied and corresponding cost increments have been analyzed. The results indicate that the method is capable of using minimum cost to control the project schedule within the planning period.
Keywords
Acceleration; Buildings; Optimization; Production; Project management; Schedules; Network Planning; Optimization of Project duration; Project Management;
fLanguage
English
Publisher
ieee
Conference_Titel
Measuring Technology and Mechatronics Automation (ICMTMA), 2015 Seventh International Conference on
Conference_Location
Nanchang, China
Print_ISBN
978-1-4673-7142-1
Type
conf
DOI
10.1109/ICMTMA.2015.185
Filename
7263680
Link To Document