• DocumentCode
    743482
  • Title

    First superconductor integrated into urban grid ´works without a hitch´ [News Briefing]

  • Author

    Pultarova, Tereza

  • Volume
    9
  • Issue
    11
  • fYear
    2014
  • fDate
    12/1/2014 12:00:00 AM
  • Firstpage
    20
  • Lastpage
    20
  • Abstract
    THE WORLD´S LONGEST superconductive cable and the first to have been integrated into an urban electricity grid has celebrated six months of flawless operations. Part of the AmpaCity project, the 1km-long 10kV hightemperature superconductive (HTS) cable was built into the inner city grid in Essen, Germany, at the end of April 2014.
  • fLanguage
    English
  • Journal_Title
    Engineering & Technology
  • Publisher
    iet
  • ISSN
    1750-9637
  • Type

    jour

  • DOI
    10.1049/et.2014.1121
  • Filename
    7055511