A Bilevel Model for Project Scheduling in a Fuzzy Random Environment
Author
Xu, Jiuping ; Ma, Yanfang ; Xu, Zeshui
Author_Institution
State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu, China
Volume
45
Issue
10
fYear
2015
Firstpage
1322
Lastpage
1335
Abstract
In this paper, a new bilevel model with multiple decision-makers is proposed for a project scheduling problem (PSP) which considers the interests of both the project owner and contractor. In this model, the project owner is considered to be the leader and the contractor, the follower. The project owner has two objectives: 1) to maximize profit and 2) minimize makespan, while the contractor’s objective is to minimize cost only. A fuzzy random simulation-based bilevel global-local-neighbor particle swarm optimization technique is proposed to solve the multiple decision-maker PSP (MDPSP). A case study based on the Wanjiakouzi Hydropower Station is used to demonstrate an application of the developed model and illustrate the scope of the MDPSP.
Keywords
Indexes; Investment; Linear programming; Mathematical model; Random variables; Uncertainty; Vectors; Bilevel programming (BP); fuzzy random variables; multiple decision-makers; particle swarm optimization (PSO); project scheduling;
fLanguage
English
Journal_Title
Systems, Man, and Cybernetics: Systems, IEEE Transactions on
Publisher
ieee
ISSN
2168-2216
Type
jour
DOI
10.1109/TSMC.2015.2406863
Filename
7059228
Link To Document