A Bilevel Model for Project Scheduling in a Fuzzy Random Environment
Author :
Xu, Jiuping ; Ma, Yanfang ; Xu, Zeshui
Author_Institution :
State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu, China
Volume :
45
Issue :
10
fYear :
2015
Firstpage :
1322
Lastpage :
1335
Abstract :
In this paper, a new bilevel model with multiple decision-makers is proposed for a project scheduling problem (PSP) which considers the interests of both the project owner and contractor. In this model, the project owner is considered to be the leader and the contractor, the follower. The project owner has two objectives: 1) to maximize profit and 2) minimize makespan, while the contractor’s objective is to minimize cost only. A fuzzy random simulation-based bilevel global-local-neighbor particle swarm optimization technique is proposed to solve the multiple decision-maker PSP (MDPSP). A case study based on the Wanjiakouzi Hydropower Station is used to demonstrate an application of the developed model and illustrate the scope of the MDPSP.
Keywords :
Indexes; Investment; Linear programming; Mathematical model; Random variables; Uncertainty; Vectors; Bilevel programming (BP); fuzzy random variables; multiple decision-makers; particle swarm optimization (PSO); project scheduling;
fLanguage :
English
Journal_Title :
Systems, Man, and Cybernetics: Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
2168-2216
Type :
jour
DOI :
10.1109/TSMC.2015.2406863
Filename :
7059228
Link To Document :
بازگشت