DocumentCode
753459
Title
Three-area joint dispatch production costing
Author
Lee, FYed N.
Author_Institution
Oklahoma Univ., Norman, OK, USA
Volume
3
Issue
1
fYear
1988
fDate
2/1/1988 12:00:00 AM
Firstpage
294
Lastpage
300
Abstract
Joint dispatch, in which all the generating resources in an interconnected system are centrally dispatched, can result in significant production cost savings as compared with independent area dispatch. A three-area production simulation model is presented that evaluates the expected unit energy generation, the expected area unserved energy, and the expected poolwide and area production cost savings. Random-unit forced outages, unit joint ownership, and transmission interconnection constraints are considered in the model. The simulation results for a sample three-area system are presented
Keywords
economics; load dispatching; power system interconnection; economics; energy generation; forced outages; generating resources; interconnected power systems; joint dispatch; production costing; production simulation model; transmission interconnection; Costing; Costs; Energy exchange; Interconnected systems; Network topology; Production; Resource management;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.43214
Filename
43214
Link To Document