Abstract :
This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the remuneration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed
Keywords :
costing; economics; hydroelectric power stations; power system planning; Brazilian power system; decentralized planning; economic signals; energy production; hydroelectric power systems; marginal cost concepts; turbines; upstream reservoirs dimensioning; Costs; Investments; Power generation economics; Power system economics; Power system planning; Power systems; Privatization; Production; Reservoirs; US Government;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.373975
Filename :
373975
Link To Document :
بازگشت