Scheduling analysis of time-constrained dual-armed cluster tools
Author :
Kim, Ja-Hee ; Lee, Tae-Eog ; Lee, Hwan-Yong ; Park, Doo-Byeong
Author_Institution :
Dept. of Ind. Eng., Korea Adv. Inst. of Sci. & Technol., Taejon, South Korea
Volume :
16
Issue :
3
fYear :
2003
Firstpage :
521
Lastpage :
534
Abstract :
Cluster tools, each of which consists of several single-wafer processing chambers and a wafer handling robot, have been increasingly used for diverse wafer fabrication processes. Processes such as some low pressure chemical vapor deposition processes require strict timing control. Unless a wafer processed at a chamber for such a process leaves the chamber within a specified time limit, the wafer is subject to quality problems due to residual gases and heat. We address the scheduling problem for such time-constrained dual-armed cluster tools that have diverse wafer flow patterns. We propose a systematic method of determining the schedulable process time range for which there exists a feasible schedule that satisfies the time constraints. We explain how to select the desirable process times within the schedulable process time range. We present a method of determining the tool operation schedule. For more flexible scheduling under the time constraints, we propose a modification of the conventional swap operation in order to allow wafer delay on a robot arm during a swap operation. We compare the performance of the new swap strategy with that of the conventional swap strategy.
Keywords :
Petri nets; cluster tools; delays; integrated circuit manufacture; linear programming; materials handling; production control; timing; diverse wafer flow patterns; dual-armed cluster tools; flexible scheduling; schedulable process time range; scheduling analysis; single wafer processing chambers; swap operation modification; time-constrained cluster tools; timing control; tool operation schedule; wafer delay; wafer fabrication processes; wafer handling robot; Chemical vapor deposition; Delay effects; Fabrication; Gases; Job shop scheduling; Pressure control; Robots; Temperature; Time factors; Timing;
fLanguage :
English
Journal_Title :
Semiconductor Manufacturing, IEEE Transactions on
Publisher :
ieee
ISSN :
0894-6507
Type :
jour
DOI :
10.1109/TSM.2003.815203
Filename :
1219500
Link To Document :
بازگشت