DocumentCode :
765466
Title :
Long-term/mid-term resource optimization of a hydrodominant power system using interior point method
Author :
Christoforidis, M. ; Aganagic, M. ; Awobamise, B. ; Tong, S. ; Rahimi, A.F.
Author_Institution :
Schweizerische Bundesbahmen, Zollikofen, Switzerland
Volume :
11
Issue :
1
fYear :
1996
fDate :
2/1/1996 12:00:00 AM
Firstpage :
287
Lastpage :
294
Abstract :
This paper describes the modeling approach and the solution techniques that were employed in developing the long-term/mid-term resource scheduling (LMRS) function for the power system of Schweizerische Bundesbahnen (Swiss Railways). LMRS together with the annual load forecast and annual maintenance scheduling functions constitute the long-term/mid-term operational planning subsystem of Swiss Railways´ new energy management system
Keywords :
hydroelectric power stations; hydrothermal power systems; load forecasting; load management; power system planning; railways; scheduling; Schweizerische Bundesbahnen; Swiss Railways; annual load forecast; annual maintenance scheduling functions; energy management system; hydrodominant power system; interior point method; long-term operational planning; long-term resource optimization; mid-term operational planning; mid-term resource optimization; Contracts; Job shop scheduling; Power system control; Power system modeling; Power system planning; Power systems; Process planning; Rail transportation; Reservoirs; USA Councils;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.486108
Filename :
486108
Link To Document :
بازگشت