Long-term/mid-term resource optimization of a hydrodominant power system using interior point method
Author
Christoforidis, M. ; Aganagic, M. ; Awobamise, B. ; Tong, S. ; Rahimi, A.F.
Author_Institution
Schweizerische Bundesbahmen, Zollikofen, Switzerland
Volume
11
Issue
1
fYear
1996
fDate
2/1/1996 12:00:00 AM
Firstpage
287
Lastpage
294
Abstract
This paper describes the modeling approach and the solution techniques that were employed in developing the long-term/mid-term resource scheduling (LMRS) function for the power system of Schweizerische Bundesbahnen (Swiss Railways). LMRS together with the annual load forecast and annual maintenance scheduling functions constitute the long-term/mid-term operational planning subsystem of Swiss Railways´ new energy management system
Keywords
hydroelectric power stations; hydrothermal power systems; load forecasting; load management; power system planning; railways; scheduling; Schweizerische Bundesbahnen; Swiss Railways; annual load forecast; annual maintenance scheduling functions; energy management system; hydrodominant power system; interior point method; long-term operational planning; long-term resource optimization; mid-term operational planning; mid-term resource optimization; Contracts; Job shop scheduling; Power system control; Power system modeling; Power system planning; Power systems; Process planning; Rail transportation; Reservoirs; USA Councils;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.486108
Filename
486108
Link To Document