DocumentCode :
768190
Title :
Correction to "How to model reliability-growth when times of design modifications are known"
Author :
Pulcini, G.
Author_Institution :
Dept. of Stat. & Reliability, CNR, Naples, Italy
Volume :
51
Issue :
2
fYear :
2002
fDate :
6/1/2002 12:00:00 AM
Firstpage :
252
Lastpage :
253
Abstract :
A typographical error in the log-likelihood in the paper by N. Ebrahimi (see ibid., vol.45, p.54-8, 1996) is corrected.
Keywords :
maximum likelihood estimation; reliability theory; design modification times; log-likelihood; maximum likelihood estimate; reliability-growth modelling; typographical error correction; Aerospace engineering; Councils; Covariance matrix; Equations; Maximum likelihood estimation; Statistics; Testing;
fLanguage :
English
Journal_Title :
Reliability, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9529
Type :
jour
DOI :
10.1109/TR.2002.1011532
Filename :
1011532
Link To Document :
بازگشت