DocumentCode
771320
Title
Multi-area unit commitment
Author
Lee, Fred N. ; Feng, Qibei
Author_Institution
Sch. of Electr. Eng. & Comput. Sci., Oklahoma Univ., Norman, OK, USA
Volume
7
Issue
2
fYear
1992
fDate
5/1/1992 12:00:00 AM
Firstpage
591
Lastpage
599
Abstract
The authors present a thermal unit commitment method for interconnected multiarea power systems. The method is a natural extension of the commitment utilization factor (CUF)-based single-area unit commitment method. CUF is extended to reflect the impact of multiarea transmission interconnection constraints on the utilization efficiency of committing a candidate unit at a given priority position. The multiarea CUF is used in conjunction with the average full load cost. (AFLC) to efficiently determine the optimal or a near-optimal multiarea priority commitment order. This priority order is then used to generate the multiarea unit commitment schedule. The excellent quality of the results of the CUF-based multiarea method is consistent with that of the previously reported single-area method
Keywords
load dispatching; load distribution; power system interconnection; scheduling; thermal power stations; transmission networks; average full load cost; commitment utilization factor; efficiency; interconnected multiarea power systems; scheduling; thermal power stations; transmission interconnection; unit commitment; Computer science; Costs; Equations; Position measurement; Power generation economics; Power system interconnection; Power system simulation; Spinning; Thermal engineering; Thermal factors;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.141764
Filename
141764
Link To Document