• DocumentCode
    771746
  • Title

    Fast acting load shedding

  • Author

    Nirenberg, S.A. ; McInnis, D.A. ; Sparks, K.D.

  • Author_Institution
    Florida Power & Light Co., Miami, FL, USA
  • Volume
    7
  • Issue
    2
  • fYear
    1992
  • fDate
    5/1/1992 12:00:00 AM
  • Firstpage
    873
  • Lastpage
    877
  • Abstract
    The fast acting load shedding (FALS) function was developed to fulfil a need for a statewide relay that detects a system disturbance that is stable but results in lines operating beyond their ratings, low system voltages, and heavy reactive demand on generating units. The FALS function then sheds enough customer load in a short amount of time to prevent a cascading loss of a line or generator with the possibility of a blackout. The FALS function uses the System Control Center computers and statewide supervisory control and data acquisition (SCADA) communications to act as a really that detects this specific type of disturbance and initiates a controlled load shed. The authors describe the system conditions necessitating the development of the FALS function, the design criteria, its computer implementation, operating experience, and known deficiencies
  • Keywords
    SCADA systems; load shedding; power system computer control; SCADA; System Control Center computers; cascading loss prevention; computer implementation; customer load shedding; fast acting load shedding; operating experience; statewide relay; supervisory control and data acquisition; system disturbance detection; Communication system control; Control systems; Low voltage; Medical services; Power system dynamics; Power system protection; Power system relaying; Power system security; Power system transients; Power systems;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.141798
  • Filename
    141798