Title :
Hydrostatic Leveling Systems
Author :
Pellissier, Pierre F.
Author_Institution :
Lawrence Radiation Laboratory University of California Berkeley, California
fDate :
6/1/1965 12:00:00 AM
Abstract :
The 200-BeV proton synchrotron being proposed by the Lawrence Radiation Laboratory is about 1 mile in diameter. The tolerance for accuracy in vertical placement of magnets is ±0.002 inches. Because conventional high-precision optical leveling to this accuracy is very time consuming, an alternative method using an extended mercury-filled system has been developed at LRL. This permanently installed reference system is expected to be accurate within ±0.001 in. across the 1-mile diameter machine.
Keywords :
Art; Atomic measurements; Energy measurement; Hoses; Laboratories; Magnets; Protons; Surface tension; Synchrotron radiation; Temperature;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1965.4323587