DocumentCode :
782470
Title :
Launching of series fabrication of the LHC main quadrupoles
Author :
Burgmer, R.. ; Bussjäger, R. ; Krischel, D. ; Peyrot, M. ; Rifflet, J.M. ; Schmidt, P. ; Simon, F. ; Tortschanoff, T.
Author_Institution :
ACCEL Instruments GmbH, Bergisch Gladbach, Germany
Volume :
12
Issue :
1
fYear :
2002
fDate :
3/1/2002 12:00:00 AM
Firstpage :
287
Lastpage :
290
Abstract :
A collaboration agreement between CERN and CEA-Saclay resulted in the successful development and construction of prototypes of the LHC main superconducting quadrupole magnets and their assembly into cold masses. A call for tender was issued in October 1999 and led to the adjudication of a contract to ACCEL Instruments. A number of components will be provided by CERN to be used either directly by ACCEL for integration into the cold mass units or by subsuppliers before delivery to ACCEL. During the series fabrication, CEA´s engineers and technicians, already experienced from their prototype work, will ensure the technology transfer and the technical follow-up in the factory. ACCEL had to adapt two large fabrication halls to the needs of the magnet fabrication and the cold mass assembly. Procedures for a tight quality assurance and the logistics for the timely supply of components and a high production rate are being established in close collaboration by the three parties concerned.
Keywords :
accelerator magnets; colliding beam accelerators; proton accelerators; storage rings; superconducting magnets; synchrotrons; LHC; fabrication; main quadrupoles; quality assurance; superconducting quadrupole magnets; Assembly; Collaboration; Contracts; Design engineering; Fabrication; Instruments; Large Hadron Collider; Prototypes; Superconducting magnets; Technology transfer;
fLanguage :
English
Journal_Title :
Applied Superconductivity, IEEE Transactions on
Publisher :
ieee
ISSN :
1051-8223
Type :
jour
DOI :
10.1109/TASC.2002.1018402
Filename :
1018402
Link To Document :
بازگشت