• DocumentCode
    784831
  • Title

    The Failure of the Alternators of the Nimrod Main Magnet Power Supply

  • Author

    Brooks, H.C. ; Reed, A.B.D.

  • Author_Institution
    Rutherford High Energy Laboratory, England
  • Volume
    14
  • Issue
    3
  • fYear
    1967
  • fDate
    6/1/1967 12:00:00 AM
  • Firstpage
    517
  • Lastpage
    521
  • Abstract
    The paper describes the failure of one of the two magnet power supply alternators which resulted in the rewind of one stator and the modification and rebuild of the rotors of both alternators. This failure prevented Nimrod operating at 7 GeV from late February, 1965 to the end of November, 1965. Certain design changes made when the rotors were rebuilt are described. A resume is given of the investigations carried out immediately after the failure, while rebuilding was in progress, and after the machines were returned to service. Present plans are also briefly mentioned.
  • Keywords
    Alternators; Converters; Lamination; Neck; Power supplies; Rotors; Shafts; Stators; Stress; Synchronous motors;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1967.4324613
  • Filename
    4324613