• DocumentCode
    785511
  • Title

    Capability vs Cost for Servicing and Handling System Choices in 200-BeV Accelerator Design Study

  • Author

    Salsig, W.W.

  • Author_Institution
    Lawrence Radiation Laboratory University of California Berkeley, California
  • Volume
    14
  • Issue
    3
  • fYear
    1967
  • fDate
    6/1/1967 12:00:00 AM
  • Firstpage
    887
  • Lastpage
    891
  • Abstract
    Unprecedented size, residual radiation, and the need for quite reliable operation of the 200-GeV accelerator present new challenges in servicing and maintenance. Yet costs must not be disproportionately large. An example servicing solution is developed, and variations are investigated for costs. It is shown that large-percentage cost changes are not to be expected, but that small changes can represent millions of dollars. Therefore extraordinary care should be exercised in refining appropriate solutions. The era of thorough preconstruction mock-up work has arrived in the accelerator business!
  • Keywords
    Colliding beam accelerators; Collimators; Costs; Foot; Frequency; Laboratories; Magnets; Maintenance; Particle accelerators; Particle beams;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1967.4324675
  • Filename
    4324675