DocumentCode :
789259
Title :
Scheduling algorithm of data sampling times in the integrated communication and control systems
Author :
Hong, Seung Ho
Author_Institution :
Dept. of Control & Instrum. Eng., Hanyang Univ., Ansan, South Korea
Volume :
3
Issue :
2
fYear :
1995
fDate :
6/1/1995 12:00:00 AM
Firstpage :
225
Lastpage :
230
Abstract :
Integrated communication and control systems (ICCS) consist of several distributed control processes which share a network medium. Performance of several feedback control loops in the ICCS is subject to the network-induced delays from sensor to controller and from controller to actuator. The network-induced delays are directly dependent upon the data sampling times of the control components which share a network medium. In this study, a scheduling algorithm of determining data sampling times is developed using the window concept, where the sampled data from the control components in the ICCS share a limited number of windows, so that the performance requirement of each control loop is satisfied as well as the utilization of network resources is considerably increased. The scheduling algorithm is verified by discrete-event/continuous-time simulation model of an example of ICCS
Keywords :
control systems; delays; discrete event simulation; distributed control; feedback; large-scale systems; sampled data systems; scheduling; continuous-time simulation; data sampling times; discrete-event simulation; distributed control processes; feedback control loops; integrated communication control systems; network-induced delays; scheduling; window concept; Automatic control; Centralized control; Communication system control; Control systems; Distributed control; Job shop scheduling; Processor scheduling; Real time systems; Sampling methods; Scheduling algorithm;
fLanguage :
English
Journal_Title :
Control Systems Technology, IEEE Transactions on
Publisher :
ieee
ISSN :
1063-6536
Type :
jour
DOI :
10.1109/87.388131
Filename :
388131
Link To Document :
بازگشت