DocumentCode :
790594
Title :
Short-Circuit Calculations and Relay Coordination Applied to Cement Plants
Author :
Shah, D.K. ; Shannon, G.A.
Author_Institution :
Bendy Engineering Company, St. Louis, Mo. 63132.
Issue :
1
fYear :
1974
Firstpage :
57
Lastpage :
65
Abstract :
Today´s codes and regulations make a coordinated power system a must for cement plants, both new ones and also the older plants. Short-circuit calculations must be made for ali possible fault points in the system. Based on calculated fault currents, all the system protective devices must be applied and coordinated properly to achieve a coordinated power system.
Keywords :
Circuit faults; Current transformers; Fault currents; Impedance; Industrial power systems; Power system faults; Power system protection; Power system relaying; Protective relaying; Relays;
fLanguage :
English
Journal_Title :
Industry Applications, IEEE Transactions on
Publisher :
ieee
ISSN :
0093-9994
Type :
jour
DOI :
10.1109/TIA.1974.349119
Filename :
4157552
Link To Document :
بازگشت