    Safety considerations when placing a person with tools in an air gap to change porcelain and glass insulators on transmission systems of 345 kV and above, using ladder and aerial lift methods

  • Volume
    17
  • Issue
    3
  • fYear
    2002
  • fDate
    7/1/2002 12:00:00 AM
  • Firstpage
    805
  • Lastpage
    808
  • Abstract
    This paper provides general considerations for determining working clearances required to carry out live line barehand insulator change out work on energized power lines operating at 345 kV and above. It is intended to focus on a limited number of procedures and only addresses one common structure configuration. This paper is intended to be used in conjunction with IEEE 516 Guide for Maintenance Methods on Energized Power Lines.
  • Keywords
    air gaps; maintenance engineering; poles and towers; porcelain insulators; power overhead lines; safety; 345 kV; IEEE 516 Guide for Maintenance Methods on Energized Power Lines; aerial lift methods; air gap; bare hand work; energized power lines; glass insulators; insulator change out work; ladder methods; live line work; porcelain insulators; safety; transmission systems; Air safety; Conductors; Glass; Helium; Insulation; Load flow; Porcelain; Power system transients; Power transmission lines; Voltage control;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/TPWRD.2002.1022807
  • Filename
    1022807