• DocumentCode
    798120
  • Title

    Setting Test Intervals and Allowable Bypass Times as a Function of Protection System Goals

  • Author

    Hirsch, Herbert M.

  • Author_Institution
    General Electric Company San Jose, California
  • Volume
    18
  • Issue
    1
  • fYear
    1971
  • Firstpage
    488
  • Lastpage
    494
  • Abstract
    This analysis demonstrates the usefulness of availability design goals for determining required periodic test intervals and allowable bypass times as permitted by IEEE-279 criteria. Formulas are developed for calculating these times for instrumentation logic configurations common to reactor protection systems. Both simultaneous and uniformly staggered test schedules are considered. In addition to sample problems illustrating the application of these formulas, nomographs are presented for rapid graphical determination of test intervals and bypass times.
  • Keywords
    Availability; Calibration; Inductors; Logic testing; Nuclear power generation; Power system protection; Reactor instrumentation; Safety; Sections; System testing;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1971.4325914
  • Filename
    4325914