Title :
Master Timing System for CEA Colliding Beam Project
Author :
Anderson, Bruce C.
Author_Institution :
Cambridge Electron Accelerator Cambridge, Mass.
fDate :
6/1/1971 12:00:00 AM
Abstract :
The CEA colliding beam project requires trigger signals relative to the e- and e+ circumferential beam positions in the accelerator. These triggers are required for proper timing of multicycle injection, steering of the beam into the bypass, triggering of beam monitoring and excitation devices. The synchronizer was built to provide these triggers.
Keywords :
Circuits; Clocks; Colliding beam accelerators; Delay; Frequency conversion; Particle beams; Radio frequency; Shift registers; Synchronization; Timing;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1971.4326080