Title :
The Brookhaven AGS Conversion Project
Author :
Wheeler, George W.
Author_Institution :
Brookhaven National Laboratory Upton, New York
fDate :
6/1/1971 12:00:00 AM
Abstract :
Most major features of the AGS Conversion Project are at or near completion. The entire Project should be completed within a year. The 200-MeV linac injector has accelerated beam to full energy and is undergoing detailed tune-up. The AGS main ring rf amplifier system has been running for a year. The new main magnet power supply has recently come into operation resulting in increased repetition rate and longer flat top for the AGS. Other features are well advanced.
Keywords :
Acceleration; Laboratories; Linear accelerators; Linear particle accelerator; Particle beam injection; Particle beams; Power supplies; Protons; Radiofrequency amplifiers; Structural beams;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1971.4326103