DocumentCode
803858
Title
A simulation-based optimization framework for product development cycle time reduction
Author
Abdelsalam, Hisham M E ; Bao, Han P.
Author_Institution
Decision Support Dept., Cairo Univ., Egypt
Volume
53
Issue
1
fYear
2006
Firstpage
69
Lastpage
85
Abstract
By the mid-1990s, the importance of early introduction of new products to both market share and profitability became fully understood. Thus, reducing product time-to-market became an essential requirement for continuous competition. Since product development projects (PDPs) are based on information content and their accompanying information-dominated methods, an efficient methodology for reducing PDP time initially requires developing an understanding of the information flow among different project processes. One tool that helps achieving this understanding is the design structure matrix (DSM). Because much of the time involved in a complex PDP is attributable to its expensive iterative nature, resequencing project activities for efficient execution become the next requirement. This paper presents a simulation-based optimization framework that determines the optimal sequence of activities execution within a PDP that minimizes project total iterative time given stochastic activity durations. A mathematical model representing the problem is built as an MS Excel module and Visual Basic for Applications (VBA) is used to interface this module with a metaheuristic optimization algorithm called Simulated Annealing and commercial risk analysis software "Crystal Ball" to solve the model.
Keywords
Monte Carlo methods; Visual BASIC; manufacturing industries; optimised production technology; product design; product development; profitability; project management; risk analysis; simulated annealing; Crystal Ball; MS Excel module; Monte Carlo simulation; Visual Basic; commercial risk analysis software; design structure matrix; information flow; information-dominated method; iterative time; market share; mathematical analysis; metaheuristic optimization algorithm; product development cycle; product development project; product time-to-market reduction; profitability; project management; project process; simulated annealing; simulation-based optimization framework; stochastic activity duration; Analytical models; Application software; Iterative algorithms; Mathematical model; Product development; Profitability; Software algorithms; Stochastic processes; Time to market; Visual BASIC; Manufacturing; Monte Carlo simulation; optimization; project management; sequencing;
fLanguage
English
Journal_Title
Engineering Management, IEEE Transactions on
Publisher
ieee
ISSN
0018-9391
Type
jour
DOI
10.1109/TEM.2005.861805
Filename
1580895
Link To Document