DocumentCode
809253
Title
Algorithm for load-shedding operations in reduced generation periods
Author
Wong, K.P. ; Lau, B.S.
Author_Institution
Dept. of Electr. & Electron. Eng., Western Australia Univ., Nedlands, WA, Australia
Volume
139
Issue
6
fYear
1992
fDate
11/1/1992 12:00:00 AM
Firstpage
478
Lastpage
490
Abstract
The authors develop an algorithm for the selection of load circuits to shed in periods of reduced generation. After reviewing the requirements and operational constraints in load shedding and circuit restoration, the authors develop strategies for the selection of substations and circuits to be shed and restored. These strategies form the basis of the developed algorithm. Formulae for calculating the operating frequency under overload conditions are derived for systems containing motive and nonfrequency-dependent loads. Based on the operating frequency, formulae for the determination of the load shed size are developed and incorporated in the algorithm. The algorithm is declarative in nature and is implemented using Prolog. A logic approach to represent the information and decision parameters of substations and load circuits is outlined. The structure of the developed software system is described and the system is applied to an application example in which the period of reduced generation lasts for 6 h
Keywords
load shedding; power engineering computing; substations; Prolog; algorithm; circuit restoration; circuits; load circuits; load-shedding operations; logic approach; motive loads; nonfrequency-dependent loads; operating frequency; reduced generation periods; substations;
fLanguage
English
Journal_Title
Generation, Transmission and Distribution, IEE Proceedings C
Publisher
iet
ISSN
0143-7046
Type
jour
Filename
173252